Retaining Wall Checklist - Free Download

Thirteen practical checks to work through before you commit to a retaining wall in Perth - covering the WA permit position, engineering, drainage and getting a proper quote. Enter your email below and we'll send it to you.

Retaining Wall Perth Checklist - Method and Sources

What this is, and is not: a practical pre-project checklist, not a compliance certificate and not a substitute for council or engineering advice. What it's based on: the WA Building Act 2011 permit exemption test, AS 4678 engineering practice, and the drainage detail that most commonly causes Perth retaining wall failures - drawn from this site's own research, cited on the relevant engineered walls and drainage service pages, and from Building and Energy WA. Assumption set: a standard residential retaining wall on a typical Perth block - an unusual site or a commercial project may need checks beyond this list.

  1. 1

    Measure the actual retained height

    WA's 0.5m building-permit exemption is measured on retained ground, not wall face height - get this wrong and you may start work without a permit you actually needed.

  2. 2

    Check boundary and proximity

    A wall on or near a boundary, or within 1.5m of another structure, can need approval regardless of height.

  3. 3

    Confirm if the wall is associated with other building work

    A wall tied to a driveway, pool, extension or another structure loses the standalone-wall exemption even if it is under 0.5m.

  4. 4

    Check for a surcharge load

    Anything sitting above the retained soil (driveway, building, pool, another wall) can trigger approval at any height.

  5. 5

    Get council confirmation in writing

    WA council wording and thresholds vary in detail - a written confirmation avoids relying on a general rule that doesn't quite match your council.

  6. 6

    Ask whether engineering is required

    Structural design to AS 4678 by a registered building engineering practitioner is required once a wall crosses the relevant trigger - confirm before you commit to a design.

  7. 7

    Check the ground condition, not just the slope

    Perth's ground varies block to block - shallow limestone, loose coastal sand and clay-prone river-flat soil each need a different wall and footing approach.

  8. 8

    Plan the drainage before the wall, not after

    Ag-drain, free-draining gravel backfill and geofabric (a filter fabric that stops the drain clogging with soil) behind the wall are structural requirements, not an optional extra - retrofitting drainage later is far more expensive.

  9. 9

    Confirm the stormwater discharge point

    Drainage from a retaining wall must connect to an approved point and stay within the property boundary - it cannot be directed onto a neighbour.

  10. 10

    Get a written, itemised quote

    A quote that separates material, labour, excavation, drainage and engineering lets you compare providers properly and avoids surprise add-ons.

  11. 11

    Ask about access and machinery reach

    Hills and rear-of-block sites with limited access can add real cost - flag this before pricing, not after.

  12. 12

    Check whether builder-contractor registration applies

    Registration in WA turns on the value and nature of the job, not the wall type alone - confirm your specific project with Building and Energy WA if you're unsure.

  13. 13

    Ask what happens with tiered or stepped walls

    Some councils assess the combined height of tiered walls against the 0.5m threshold rather than each tier separately.

Get the checklist

Enter your details and we'll send the full checklist to your email.

Optional - it helps us point your enquiry the right way.

Your details are only used to arrange your enquiry. See our privacy policy.